Contracted by Onslow Salt Mine to carry out jetty maintenance.
Key aspects of job:
Carry out scheduled maintenance
Replace old anodes
High pressure cleaning
Corrosion control
Design & installation of cathodic protection system
Removal of jetty pile lugs (Broco)
Removal of growth and rust
Installation of Denso Seashield 2000 corrosion control measures on 104 jetty piles
Installation of snap back cages
Replacement of fenders
Comments